WHAT’S PRECISION WORTH TO YOU?

This calculator is used to estimate the potential cost of material waste caused by excavation errors. While actual excavation errors can vary across a site, this tool assumes that the same depth error occurs uniformly across the entire surface area.
TOTAL VOLUME OF EXTRA MATERIAL
Result
M3
TOTAL COST OF EXTRA MATERIAL
Type Result: .
DKK
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

1000 M3 EXTRA MATERIAL

APPROX. 50 TRUCK LOADS

THE RIPPLE EFFECT OF EXCAVATION ERRORS

This tool shows only the direct cost of extra or missing material. Real-world excavation errors can have a ripple effect on your entire project timeline and budget.

Labor Costs

Excavation errors often require rework, which means paying operators, surveyors, and support crews to do the same job twice.

--------ICON: CLOCK

Time & Project Delays

Over-excavation often means waiting for extra material to arrive, stalling progress. Under-excavation requires rework and re-checking, eating up valuable time and pushing the schedule back.

---------ICON: Truck

Hauling Costs

Over-excavation means hauling in extra fill to correct the depth. Under-excavation often leads to rework and another round of hauling out material. Either way, you're paying for transport that could have been avoided.
Australia
Austria
Belgium
Canada
Czech Republic
Denmark
Estonia
Faroe Islands
Finland
France
Germany
Hungary
Hungary
Iceland
Ireland
Italy
Latvia
Lithuania
Netherlands
New Zealand
Norway
Poland
Romania
Scotland
Serbia
Slovakia (Slovak Republic)
Sweden
Switzerland
United Kingdom
United States
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Contact us
to learn more

Want to learn more about how Unicontrol3D can help you control your material costs?

Fill out our contact form, and we will get in touch with you as soon as possible to provide you with all the information you need. We look forward to hearing from you.